You are here: Welcome » TSM Manual » 5350contract_jobs » Variations
Differences
This shows you the differences between two versions of the page.
| 5000manual:5350contract_jobs:5370variations [2020/06/18 09:34] – external edit 127.0.0.1 | 5000manual:5350contract_jobs:5370variations [2021/01/06 14:49] (current) – rajeev.ranjan | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ===== Variations ===== | ===== Variations ===== | ||
| - | {{: | + | {{: |
| Often, changes are required to a Contract Job after the job has been approved and quoted for. These changes or variations can be applied to individual stages of a Contract Job. | Often, changes are required to a Contract Job after the job has been approved and quoted for. These changes or variations can be applied to individual stages of a Contract Job. | ||