TSM Wiki

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

5000manual:5350contract_jobs:5372costcentre [2020/06/18 09:34] – external edit 127.0.0.15000manual:5350contract_jobs:5372costcentre [2021/01/06 14:48] (current) – rajeev.ranjan
Line 1: Line 1:
 ===== Cost Centres ===== ===== Cost Centres =====
  
-{{:5000manual:5350contract_jobs:costc.png?500|Cost Centres tab}}+{{:5000manual:5350contract_jobs:cost_center686.png?600|Cost Centres tab}}
  
 When estimating a Contract Job, you need to break up each stage and variation into Cost Centres. The Cost Centre outlines the dissection of the financial details of the stage or variation into labour, materials or whatever you want to assign. When estimating a Contract Job, you need to break up each stage and variation into Cost Centres. The Cost Centre outlines the dissection of the financial details of the stage or variation into labour, materials or whatever you want to assign.