Stage 6.82

Stage 6.82

Contract Job Stages

Job logging details such as Department, Priority, Status, Service Code and Employee can be recorded on this tab for each Stage on a Contract Job. Information specfic to stages includes:

Stage

The sequence number of the stage. Stages are usually numbered from 1 up but you can choose any numbering sequence you want. Use the arrow buttons to change the current stages number.

Stage Description

The title of the stage, just like the job name, allows for a general description of the work therein. The tick box on the right turns this field into a dropdown menu referencing Stage Description in Codes setup. This allows standardisation of stage descriptions.

Logged

The date that the stage was originally created.

Commence By

The date that you expect to commence this stage of work. This time is used in Reports and Job Centre filtering.

Commenced

When the work on the stage actually began.

Complete By

The date the stage is due to be completed.

Completed

The actual date that this stage was completed. Populating this field will set the % Completed equal to 100%.

Order No

The order number assigned against a stage so it is able to be tracked easier.

Estimated duration

Scheduled job duration in hours. Like standard jobs, this and the Commenced By field will be populated using the settings defined on the Stages Priority Code, and are used to define the time and duration of the Stages Linked Primary Assignment (if enabled in Setup).

Estimated Time

These two controls allow you to specify the expected duration of the work for this stage. The drop down menu contains a list of time units – hours, days, weeks, etc.

Department

The default department that will be assigned against parts and labour on the stage.

Priority

The default priority against the stage.

Status

The stages current status, this allows you to track what part of the process the stage is currently at.

Service Code

The default service code against the stage, this is primarily used for reporting purposes.

Stage Type

Categorize the type of stage for reporting purposes. Same as the Job Type field on standard Jobs.

Employee

The default employee against the stage, newly created time sheets will have this employee as a default.

Tax Code

The tax code that applies against the contract stage.

Reference

The Variation reference number

Quoted Price

The total quoted sell price for the stage defined in the Cost Centres.

Original Budgeted Cost

An amount put aside for the costs of the stage, this doesn't effect any calculations it is used for reporting purposes

Original Budgeted Price

The total amount expected to be returned on the costs.

Estimated Cost

The total estimated cost of this stage defined in the Cost Centres.

Actual Cost

The actual cost of all Materials and Labour assigned to this stage and approved variations.

Approved Variation

The total sell price of all approved variations assigned to this stage.

Estimated Var Cost

The total estimated cost from Cost Centres linked to approved variations.

Actual Var Cost

The total actual cost or Parts and Labour for approved variations.

Total Price Inc Var

Total quoted price of all cost centres including approved variations.

Total Invoiced

The total value invoiced against this stage. This is only available if you have enabled applying contract invoices to stages / variations in the Contract Jobs Setup.

% Invoiced

The percentage of the stage total that has been invoiced out. This is only available if you have enabled applying contract invoices to stages / variations in the Contract Jobs Setup screen.

% Completed

For a more accurate view on the progress of a stage, you can indicate the level of completion as a percentage. Entering a stage completed date always sets the stage completion percentage to 100%. The % Completed can also be automatically calculated from the stage data (Actual Costs/Estimated Cost) if configured in Contract Jobs Setup screen.

Actual Stage Time (hrs)

The actual number of hours accumulated against the stage.

Actual Variation Time (hrs)

The actual number of hours accumulated against variations for the stage.

Invoice for parts/labour used

this drop down box changed the way the stage will be invoiced, if its invoiced for parts/labour used then all the labour and parts will be listed on the invoice and the invoice total will be the combined total of parts and labour, if fixed price invoice is selected in this drop down box then a set total can be selected for the invoice

Stage Notes

A detailed description of the stage or any other details that you would like included with this stage.

Work Performed

This field would usually appear on any associated reporting, commanding the notes therein to be more formal and concise. In the end Stage Notes and Work performed are both memo fields and can be use interchangeably. There reason there are two is that Stage Notes can be used for internal recordkeeping, whilst Work Performed can be used to accommodate bills and work reports for customers.